John H. Wohlgemuth

Photovoltaic Module Reliability


Скачать книгу

      

      Table of Contents

      1  Cover

      2  Photovoltaic Module Reliability

      3  Acknowledgments

      4  1 Introduction 1.1 Brief History of PVs 1.2 Types of PV Cells 1.3 Module Packaging – Purpose and Types 1.4 What Does Reliability Mean for PV Modules? 1.5 Preview of the Book References

      5  2 Module Failure Modes 2.1 Broken Interconnects 2.2 Broken/Cracked Cells and Snail Trails 2.3 Delamination 2.4 Corrosion of Cell Metallization 2.5 Encapsulant Discoloration 2.6 Failure of Electrical Bonds Particularly Solder Bonds 2.7 Glass Breakage 2.8 Junction Box Problems 2.9 Loss of Elastomeric Properties of Back Sheets 2.10 Reverse Bias Hot Spots 2.11 By‐Pass Diodes 2.12 Structural Failures 2.13 Ground Faults and Open Circuits Leading to Arcing 2.14 Potential Induced Degradation 2.15 Thin‐Film Specific Defects References

      6  3 Development of Accelerated Stress Tests 3.1 Thermal Cycling or Change in Temperature 3.2 Damp Heat 3.3 Humidity Freeze 3.4 Ultraviolet (UV) Light Exposure 3.5 Static Mechanical Load 3.6 Cyclic (Dynamic) Mechanical Load 3.7 Reverse Bias Hot Spot Test 3.8 Bypass Diode Thermal Test 3.9 Hail Test References

      7  4 Qualification Testing 4.1 JPL Block Buy Program 4.2 Evolution of IEC 61215 Qualification Test Sequence 4.3 IEC 61215 Test Protocol 4.4 How Qualification Tests have been Critical to Improving the Reliability and Durability of PV Modules 4.5 Limitations of the Qualification Tests 4.6 PV Module Safety Certification References

      8  5 Failure Analysis Tools 5.1 PV Performance – Analysis of Light I–V Curves 5.2 Performance as a Function of Irradiance 5.3 Dark I–V Curves 5.4 Visual Inspection 5.5 Infrared (IR) Inspection 5.6 Electroluminescence (EL) 5.7 Adhesion of Layers, Boxes, Frames, etc. References

      9  6 Using Quality Management Systems to Manufacture PV Modules 6.1 Quality Management Systems 6.2 Using ISO 9000 and IEC 61215 6.3 Why just Using IEC 61215 and ISO 9000 is No Longer Considered Adequate? 6.4 Customer Defined “Do It Yourself” Quality Management and Qualification Systems (IEC 61215 on Steroids) 6.5 Problems with the “Do It Yourself” System References

      10  7 The PVQAT Effort 7.1 Task Group 1: PV QA Guidelines for Module Manufacturing 7.2 Task Group 2: Testing for Thermal and Mechanical Fatigue 7.3 Task Group 3: Testing for Humidity, Temperature and Voltage 7.4 Task Group 4: Testing for Diodes, Shading and Reverse Bias 7.5 Task Group 5: Testing for UV, Temperature and Humidity 7.6 Task Group 6: Communications of Rating Information