Группа авторов

Renewable Energy for Sustainable Growth Assessment


Скачать книгу

decision matrix is calculated.

      5 (e) Calculate the positive ideal (V+) and negative ideal solutions (V-) as below:J is the set of beneficiary indicators and J’ is of non-beneficiary indicators(2.13)(2.14)

      6 (f) The distance of each alternative from V+ and V- is calculated as:(2.15)(2.16)

      7 (g) Determine the corresponding closeness to the best solution as below:(2.17)

      8 (h) Finally, according the value of Ri in descending order the alternatives are ranked.

      2.5.1 The TOPSIS

      2.5.2 The Fuzzy-TOPSIS

       (i) For the beneficial indicators:(2.18)

       (ii) For the non-beneficial indicators:(2.19)

RE technology I1 I2 I3 I4 I5 I6 I7 I8 I9 I10 Si+ Si- Ri Ranking
Large hydropower 0.0611 0.0822 0.0472 0.0379 0.0682 0.0179 0.0020 0.0115 0.0722 0.0674 0.0952 0.1589 0.6253 2
Small hydropower 0.0611 0.0164 0.0472 0.0483 0.0477 0.0001 0.0001 0.0344 0.0433 0.0405 0.0857 0.1587 0.6494 1
Solar PV 0.0114 0.0164 0.0189 0.0500 0.0341 0.0022 0.0022 0.0574 0.0144 0.0270 0.1030 0.1603 0.6088 4
Onshore wind power 0.0267 0.0164 0.0262 0.0403 0.0341 0.0109 0.0110 0.0574 0.0289 0.0135 0.0938 0.1505 0.6162 3
Bioenergy 0.0412 0.0493 0.0671 0.0459 0.0273 0.0978 0.0993 0.0459 0.0433 0.0539 0.1588